
MGO Board Production Line
Zhangjiagang Shenggang Enviroment Fire-Proof Construction Material Co., Ltd.- Type:Furniture Manufacture Equipment
- Origin:China
Base Info
- HS Code:8501109990
- Production Capacity:1,Month
Description
Basic Info.
HS Code 8501109990 Production Capacity 1/MonthProduct Description
MGO BOARD PRODUCTION LINEDetails of the MGO boards:
100% Non-asbestos
Fire retarancy: Grade A
Dnsity: 1080kg/m3
Bending strength: 21MPa
Tensile strength: 9.5MPa
Water absorption: 21.2%
Aqueous alkali out resistance: No water and no dampness
Impacting strength: 6.8KJ/m2.
Frost-resistance: 25 times circulations later, No delaminations and no chaps.
Noise reduction: 42dB(9 mm wall partition system)
One hour of fire rating for(9mm wall partition system)
Edge: Squared; Bevelled; Tappered.
The details as follows:
The size of MGO board production line is 15m*1.4m*0.8m(length*width*height), and the size of the workshop is 60m*15-20m*6m, we need total 30 workers to operate the whole production line. The production line which I give you could just produce the common size of board of 1220*2440*3-20mm, you also could produce the sizes as you want.
Productivity: 1200-1500PCS/day
Raw material: MGO, mgcl2, glass fiber cloth, non-woven, wood chips and perlite.
MGO: The MGO from making the foreproof board is the light burning(also called burning) power, contain 85% MGO, and the LOI(loss on ignition) is 7.
Mgcl2: The price of mgcl2 is about USD140/ton
Perlite: Frankly speaking, the perlite is not very important for MGO board, it just have the function to reduce the weight of the board. The price is USD20/m3
Glass fiber: USD 1.3/m for the 1.3*1m
Non-woven: USD 0.07/m for the 13*1m
Wood chips: It is much cheaper in your native country.
Power input: 20 kilo watt
About the raw material, I do not know whether you need to import from other countries. I think you have had a result on the raw materials.
As for the drying room, I think the temperature should be kept on 30-40 degree centigrade. In a word, the production line is including cutting machine(1), which could cut thousands boards every day, line belt(1), roller(6), material baking machine(3), motor(several). The things you need to do is to apply about 1500m2 place to build a work shop, I think 1500m2 is really enough to build it.